Posted to the Ormerod forum, apologies I didn't see it! Thank you dc42by cheeseandham - Reprappers
Hello all, I've almost built my first Ormerod 2 (528.4) and I am performing the continuity test on the "Heated bed shield" section on the wiring page. When I'm doing this with red on the shield/cable and black on the terminals and I have my multimeter in the same position as that image, I get a reading of 78 on both terminals and a beep. (with black on the shield/cable and red on the terminal Iby cheeseandham - Ormerod
Hello all, I've almost built my first Ormerod 2 (528.4) and I am performing the continuity test on the "Heated bed shield" section on the wiring page. When I'm doing this with red on the shield/cable and black on the terminals and I have my multimeter in the same position as that image, I get a reading of 78 on both terminals and a beep. (with black on the shield/cable and red on the terminal Iby cheeseandham - Reprappers