Mondrian Build Manual
English • العربية • български • català • čeština • Deutsch • Ελληνικά • español • فارسی • français • hrvatski • magyar • italiano • română • 日本語 • 한국어 • lietuvių • Nederlands • norsk • polski • português • русский • Türkçe • українська • 中文(中国大陆) • 中文(台灣) • עברית • azərbaycanca • |
Assembling and setting up the machine should take between 4h to 8h or two afternoons :) If you preassemble everything, or if you disassemble your machine for a travel, it should take 1h to put it back together.
<videoflash>QuMhb-vMsfw</videoflash>
Contents
General tips
Read the whole manual once or twice before starting, to get an overview of the build
Know the parts
Firstly, have a look at all the part and learn what everything is.
How to insert a T-nut
Tightening torque : 2.5 Nm (+/- 5%)
<videoflash>9CAiVmfO2mk|320|240</videoflash>
Base frame
x4 300mm profile x4 m4x8 x4 m4 t-nut
x4 base corner assembly x1 bottom-plate
Z-sliders
x3 z-slider x1 z-slider for endstop
x4 300mm profile x8 m4x8 x8 m4 t-nut
x3 top corner x1 top corner for z-endstop
x2 300mm profile
x2 m4x8
x2 m4 t-nut
Y-sliders
x2 nema14 stepper motor x2 pulley
x8 m3x30 counter-sunk x4 603zz bearing
The instruction show the left side, it will be the same (in mirror) for the right side.
add the pulley on the motof shaft (if you have this pulley you will need to invert it)
x2 300mm profile
x2 360mm belt
x4 m4x8
x4 t-nut
Z-drive
x4 m5 threaded rod 300mm x8 m5 nut
mr105zz