Mondrian2.1 Build Manual
English • العربية • български • català • čeština • Deutsch • Ελληνικά • español • فارسی • français • hrvatski • magyar • italiano • română • 日本語 • 한국어 • lietuvių • Nederlands • norsk • polski • português • русский • Türkçe • українська • 中文(中国大陆) • 中文(台灣) • עברית • azərbaycanca • |
Mondrian Documentation
Assembling and setting up the machine should take between 4h to 8h or two afternoons :) If you preassemble everything, or if you disassemble your machine for a travel, it should take 1h to put it back together.
<videoflash></videoflash>
Contents
General tips
Read the whole manual once or twice before starting, to get an overview of the build
Know the parts
Firstly, have a look at all the part and learn what everything is.
How to insert a T-nut
Tightening torque : 2.5 Nm (+/- 5%)
<videoflash>9CAiVmfO2mk|320|240</videoflash>
Base Frame
<videoflash>PwzbykT-d-Y|320|240</videoflash>
- base frame
Z-sliders
- nylon nut
- z-sliders
- z-profiles
- top corners
- two top profile