P3Steel X axis assembly
Revision as of 07:22, 12 December 2014 by AndrewBCN (talk | contribs) (Created page with "<center>English</center> ---- <center>Introduction | Bill of materials | Proteins | ...")
Similarly to what we did for the Y-axis assembly, we'll do this in four easy steps:
- X idler end assembly.
- X motor end assembly.
- X smooth rods and carriage installation.
- X belt installation.
Each step requires 15-20 minutes, so set aside one evening for the X axis assembly.
Contents
X idler end assembly
For this step we require this tool: